Process does not contain a start activity or event start point.
This validation message applies to the process.
Explanation
Resolution
The process has no entry point.
Perform one of the following tasks:
Configure an operation as the process start point. (See Specifying the start activity of a process.)
Add an event type as a start point for the process. (See Controlling process flow using events.)
Draw a route from an event start point to an operation. (See Drawing routes to link operations.)