Create a schedule for run

  1. In the Task dialog, click the link next to Scheduling. The link could be:

    • Not Scheduled: If the task is not scheduled

    • A description of the scheduled task, such as 20:23 every SUN of every week if the task is scheduled



  2. In the Schedule window, select the required interval, and specify the options.

  3. Click Save.


May 30, 2024

Legal Notices | Online Privacy Policy